Electrical Power Systems Engineering

WIND TURBINE POWER SYSTEMS

Arris engineers have the capability to design complete wind power generation systems. Arris can perform feasibility studies and assessment of potential sites and determine preliminary costs estimates.

Arris can provide assistance in negotiation between the client Non Utility Generation (NUG) and the local power utility. Arris can then provide complete system design from wind turbine generators system selection, through collection system, substation, transmission line and utility intertie connection.

Wind Turbine Power Systems
Wind Turbine Power Systems

Electrical Power Systems Induction Generators Wind Turbine Power Systems
Wind Turbine Power Systems
Electrical Power Systems Medium Voltage Collection Systems
Electrical Power Systems Field Engineering Services
Electrical Power Systems Spill Containment Systems
Electrical Power Systems Windfarm Output Capacity Verification
Portfolio
Portfolio Overview - View Detailed Portfolio
WEST CHESTER UNIVERSITY
WEST CHESTER UNIVERSITY The project involved the replacement of the building’s 500KVA dry-type unit substation with a new 750KVA transformer and 2000A 120/208VY secondary switchgear.
WEST CHESTER UNIVERSITY
WEST CHESTER UNIVERSITY The project involves the upgrade of the remaining 5KV medium voltage power system on campus to 15KV operation.
WHITE HAVEN - PA DEPT. OF GENERAL SERVICES
PA DEPT. OF GENERAL SERVICESUpgrade of the Electrical Distribution System.
HATBORO SEWER AUTH. TREATMENT PLANT
HATBOROR SEWER AUTH. TREATMENT PLANTSystem upgrade at the treatment facility.
WEST CHESTER UNIVERSITY
WEST CHESTER UNIVERSITYUpgrade of the existing medium voltage power system.
POPE AND TALBOT
POPE AND TALBOTDesign of a new customer owned 69 kv substation at the client’s manufacturing site.
News
NEWS

Arris Engineering has recently been awarded another design project at the Tobyhanna Army Depot. The renovations and additions to the Building 72 Mezzanine area marks the fifth project awarded this year. Arris will act as the lead design professional for this project and will work with M.E.R.I.T. Inc. in a design/build capacity to complete construction of the renovation and addition.


Arris has implemented Autodesk Revit MEP. The new software has allowed Arris to work with Architects that also utilize the Architectural version of the software and better serve to meet the client’s needs when considering a complete building system package. The software conversion included all the aspects of Autocad MEP and also allows for designs to be completed with the use of 3-D building components.