OVERVIEW Arris Engineering provides complete power systems engineering design to a variety of utility, municipal, governmental and industrial clients. More>>>
EPS SERVICES
Substations
Transmission
System Protection
System Studies
Generation
Distribution
APPROACH -
Pre-Design
Design
Construction
Post Construction
Step 1 - Pre-Design
1.
Feasibility Studies
2.
Systems Evaluation
3.
Life Cycle Costing
4.
Energy Services
5.
Forensic Studies
6.
Short Circuit Studies
7.
Point of Failure Analysis
Step 2 - Design
1.
Schematic
2.
Design Development
3.
Construction Documents
4.
Specifications
Step 3 - Construction
1.
Submittal Review
2.
Shop Drawing Review
3.
Punch Lists
4.
AS-Built Review
5.
IOM Review
6.
Warranty Review
Step 4 - Post-Construction
1.
System Commissioning
2.
Validation Services
3.
Function Tests
4.
Integrated Testing
5.
System Optimization
6.
Operation & Maintenance
7.
Training
NEWS
Arris bidding major Fire Alarm project for the West Chester University in West Chester, Pa. The project includes the replacement of the entire head end system, inter-communication system and twenty seven building systems throughout the campus. In addition, thirty five existing building fire alarm systems will tied into and report all addressable information to the new head end system.
Arris Engineering Group
was recently awarded a professional design services contract to upgrade the electrical and plumbing systems for three major buildings located at the Hollidaysburg Veterans Home Complex near Altoona, Pa. More>>
ARC-Flash Analysis
Arris Engineering announces the introduction of ARC Flash Analysis to their list of services. More>>
HIGHLIGHTED PROJECTS
ALBERT EINSTEIN MEDICAL CENTER The Albert Einstein Medical Center is a teaching hospital offering a full range of advanced health services to the Philadelphia community and beyond. More>>
HATBORO SEWER AUTHORITY TREATMENT PLANTThe System upgrade at the treatment facility. More>>
MISSION FOODS The design for all HVAC, plumbing, fire protection, and electrical systems for a new 139,000 square foot Manufacturing and Administrative Facility. More>>
WEST CHESTER UNIVERSITYUpgrade of the existing medium voltage power system. More>>