Wilkes-Barre VA
The project consisted of a comprehensive engineering study on the existing facility HVAC systems including documentation of existing environmental conditions, code requirements and conditional assessment of existing HVAC equipment throughout the facility. The study addressed recommended HVAC upgrades, alternatives, phasing issues, projected costs, and ultimately resulted in the development of a strategic 5-year HVAC upgrade plan which will guide the VA in capital expenditures for HVAC improvements for the future.